Our walk-in shower installation service creates accessible, properly waterproofed shower systems designed around the bathroom’s dimensions, drainage requirements, and daily use. With 20 years of specialized experience, Long Beach Elite Kitchen & Bathroom Remodeling provides commercial & residential shower remodeling in Long Beach, CA, with licensed professionals experienced in shower demolition, substrate preparation, waterproofing, drainage installation, wall systems, tile installation, glass enclosure coordination, and fixture placement. Each shower is configured using durable materials such as porcelain tile, ceramic tile, waterproof backer systems, moisture-resistant components, and professionally selected fixtures suited to the coastal conditions of Southern California.
We provide complete walk-in shower construction, including removal of existing shower assemblies, floor preparation, drain installation, waterproofing, wall treatment, tile installation, shower pan construction, curb or curbless configurations, niche installation, seating, glass enclosure preparation, and plumbing fixture placement. Shower layouts are planned around entry clearance, interior dimensions, drainage slope, fixture positioning, storage requirements, and the homeowner’s preferred accessibility level rather than relying on a standard configuration. Porcelain and ceramic tile can provide durable, moisture-resistant finishes, while properly specified waterproofing components protect the wall and floor assembly behind the finished surface.
Our installation process begins with an assessment of the existing shower area, including the subfloor, wall framing, plumbing connections, drain location, moisture conditions, and available floor elevation. We establish the required drainage slope, prepare stable substrates, install compatible waterproofing layers, seal penetrations, and maintain properly integrated transitions around corners, niches, benches, and plumbing fixtures to reduce the risk of water intrusion. Tile surfaces are then installed with controlled alignment, consistent joint spacing, appropriate setting materials, and properly detailed transitions to achieve a stable shower assembly that supports long-term use.
For shower replacements, we investigate signs of loose tile, failed grout, deteriorated backer materials, drainage problems, plumbing leaks, or hidden moisture damage before installing new finishes. If the surrounding structure remains suitable for renovation, corrective work can be directed toward the affected areas instead of retaining defective components beneath the new shower system. Addressing these underlying conditions helps prevent premature deterioration and protects the waterproofing and structural components supporting the finished installation.
A standard walk-in shower installation typically requires 7–14 calendar days, depending on demolition, waterproofing requirements, tile selection, plumbing modifications, and glass enclosure coordination. The finished shower provides a durable, water-managed bathing area designed for dependable daily use and long-term moisture protection.
Get a FREE Quote


Curbless walk-in shower installation creates a level entry that improves accessibility while providing a clean, contemporary bathroom configuration. Our bathroom contractors establish the required shower footprint, drain position, finished-floor elevation, wall conditions, and waterproofing boundaries before construction begins. Precision levels, laser measurement tools, wet saws, tile cutters, mixing equipment, and waterproofing application tools are used to maintain accurate slopes and finished surfaces.
The shower floor is constructed with a properly engineered drainage slope directing water toward a linear or point drain without creating standing-water areas. We use waterproof shower membranes, compatible bonding materials, cement backer board or approved wet-area substrates, waterproofing sealants, and reinforced corners to protect the assembly from moisture penetration. Threshold-free transitions require careful coordination between the shower base, bathroom flooring, drain system, and finished tile thickness.
Large-format porcelain tile, ceramic tile, natural stone, or other approved wet-area surfaces can be installed according to the selected design and maintenance requirements. Grout joints, inside corners, penetrations, and changes in plane receive appropriate waterproofing and finishing treatment rather than relying on grout alone for moisture protection. Final testing verifies drainage performance, waterproofing continuity, tile alignment, slope consistency, and secure fixture installation.

Custom shower wall tile installation protects wet-area walls while establishing the visual character of a remodeled bathroom. Tile selections can include porcelain, ceramic, marble, slate, or other suitable materials chosen according to moisture exposure, maintenance requirements, and design preferences. Our installation uses tile levels, spacers, wet saws, diamond blades, tile nippers, mixing paddles, and professional setting materials to achieve consistent lines and accurate cuts.
Wall preparation includes correcting unsuitable surfaces, establishing waterproofing boundaries, and preparing the substrate for the selected tile system. We apply approved waterproof membranes or liquid-applied waterproofing products, polymer-modified thin-set mortar, reinforcing components, and compatible grout according to the installation requirements. Niches, benches, plumbing penetrations, corners, and valve openings are measured carefully so the finished tile remains properly aligned around functional features.
Large-format panels can minimize grout joints, while smaller tile formats can create detailed patterns across shower walls and niches. Layout planning establishes balanced cuts at corners and termination points instead of leaving narrow or irregular pieces in prominent locations. Finished surfaces are checked for lippage, alignment, joint consistency, edge treatment, grout coverage, and proper transitions around shower fixtures.

Frameless glass shower installation provides an open bathroom appearance by using thick tempered safety glass with minimal visible framing and hardware. Bathroom remodeling contractors coordinate glass dimensions with the completed shower opening, wall tile, curb or floor configuration, drain location, and door swing before fabrication. Professional suction lifters, diamond drilling equipment, leveling tools, glass handling equipment, and manufacturer-approved hardware are used during installation.
Glass panels are fabricated with precise measurements for hinges, handles, clips, notches, and required clearances. We install compatible stainless-steel or corrosion-resistant hardware, structural anchors, silicone sealants, and protective components selected for wet-area conditions. Wall construction must provide adequate anchoring points because frameless systems transfer load through hinges and fixed-panel supports rather than relying on a conventional full frame.
The completed enclosure improves visual openness while maintaining a defined showering area within the bathroom. Door alignment, panel spacing, hinge operation, sealant continuity, and floor clearance are inspected carefully after installation. Glass edges and hardware are also checked for secure positioning and smooth operation before the shower enclosure is placed into regular service.

Walk-in shower conversion replaces an existing bathtub or outdated enclosure with a purpose-built shower configuration designed around the available bathroom footprint. Our remodeling process evaluates plumbing locations, wall framing, floor structure, existing waterproofing, drain placement, and finished elevations before demolition and reconstruction. Controlled demolition tools, moisture-resistant construction materials, plumbing equipment, waterproofing systems, and tile installation tools support the conversion from the existing fixture to the new shower.
The conversion can incorporate a shower pan, linear drain, built-in niche, shower bench, handheld shower, rain showerhead, grab-bar reinforcement, and custom glass enclosure according to the planned design. We prepare the substrate, modify plumbing connections where necessary, install the waterproofing assembly, and establish the required floor slope before applying finished surfaces. Porcelain tile, ceramic tile, natural stone, solid-surface panels, and other suitable wet-area materials can be selected for walls and floors.
Special attention is given to transition heights, drain positioning, waterproofing continuity, and the relationship between the new shower floor and surrounding bathroom flooring. Properly installed backing allows accessories and safety hardware to be anchored into reinforced structural points rather than unsupported wall surfaces. Final inspection confirms drainage, waterproofing details, fixture connections, tile installation, glass clearances, and overall shower functionality.
The walk-in shower installation starts with an evaluation of the existing bathroom floor, wall framing, plumbing locations, drainage position, ceiling height, and available shower footprint. Moisture meters, laser levels, measuring tools, stud finders, and inspection equipment are used to identify substrate conditions and determine whether the existing structure can support the planned shower system. The layout accounts for shower entry clearance, drain placement, wall dimensions, fixture locations, bench requirements, and glass enclosure positioning.
The shower design is developed around the selected waterproofing assembly and finished materials rather than relying solely on surface tile to control moisture. Cement backer board or an approved waterproof building panel may be used over prepared framing, with waterproof membranes, sealing tapes, prefabricated niches, and compatible corner treatments installed at vulnerable junctions. The floor assembly is also designed around the required slope toward the drain so water moves efficiently away from the finished shower surface.
Plumbing components are coordinated before wall finishes are installed, including the mixing valve, showerhead, handheld sprayer, diverter, and drain assembly. PEX, copper, or approved plumbing materials are selected according to the existing system and project requirements, while the valve depth is established based on the final wall thickness. This preparation prevents finished tile and waterproofing components from interfering with the correct operation of the shower fixtures.
The shower enclosure is prepared by removing unsuitable wall and floor materials and exposing stable framing or structural surfaces where required. Damaged framing, deteriorated subfloor areas, and unstable substrates are corrected before the waterproofing system is installed. Appropriate construction tools, including drills, impact drivers, levels, utility knives, cement-board tools, and substrate fasteners, are used to create a stable base for the shower assembly.
Waterproof wall panels or cement backer boards are installed with corrosion-resistant fasteners and properly treated joints. Waterproof membrane sheets or liquid-applied membrane systems are then applied according to the manufacturer's coverage requirements, including reinforcement at corners, seams, niches, pipe penetrations, and transitions between wall and floor surfaces. The shower floor receives a properly formed sloped base or approved shower pan system designed to direct water toward the drain without creating standing areas.
Every penetration through the waterproofing layer receives compatible sealing components around plumbing valves, shower controls, and other fixtures. The drain connection is integrated with the waterproofing system so the finished tile assembly does not become the primary moisture barrier. Waterproofing coverage is inspected before tile installation proceeds because inaccessible defects become substantially more difficult to correct after the shower surface is finished.
Wall and floor tile installation begins after the waterproofing system has been properly prepared and verified. Porcelain, ceramic, natural stone, or other selected tile is installed using manufacturer-approved thin-set mortar, appropriate trowel sizes, tile spacers, leveling clips, and movement joints where required. The layout is established around the drain, shower niche, corners, control valve, bench, and glass enclosure so the finished pattern remains balanced.
The shower floor receives smaller-format or mosaic tile where appropriate to accommodate the required slope and improve underfoot stability. Wall tiles are aligned vertically and horizontally using professional levels and layout lines, while niche shelves, corner transitions, and trim pieces are finished to maintain consistent joints. Grout is selected according to the application, with cementitious or performance-enhanced grout used based on the tile type, joint width, and moisture exposure.
Shower fixtures are installed after the finished wall thickness has been established and the tile assembly has cured sufficiently for fixture installation. Trim plates, showerheads, handheld units, diverters, valves, and drain components are fitted using compatible seals and plumbing connections to reduce leakage risk. A frameless or framed glass enclosure can then be coordinated with the finished shower dimensions, allowing door swing, fixed panels, hardware placement, and entry clearance to match the completed walk-in shower design.
The finished shower undergoes a detailed inspection covering tile alignment, grout consistency, corner joints, waterproof transitions, drain performance, fixture operation, and enclosure clearances. Water is run through the shower system to verify drainage and inspect plumbing connections for leaks. Shower controls are tested at operating temperature and pressure to confirm proper function of the valve, diverter, showerhead, and handheld components.
Sealant is applied at required changes of plane and moisture-exposed junctions using bathroom-rated silicone compatible with the selected tile and surrounding materials. Glass panels, shower doors, handles, hinges, and support hardware are checked for secure installation and smooth movement. The finished floor is examined for drainage behavior, while the walls and niche are inspected for visible installation defects.
The final walk-in shower area is cleaned using non-abrasive products appropriate for the installed tile, grout, glass, and metal fixtures. Construction residue, grout haze, adhesive traces, protective films, and installation debris are removed before the completed bathroom is reviewed against the approved specifications. The finished installation provides a properly sloped, waterproofed, tiled shower enclosure designed for reliable daily use in Long Beach, CA.
Walk-in shower installation requires more than placing tile around an open shower area because the enclosure must control water movement while protecting the underlying wall and floor assembly. Our shower remodeling contractors evaluate the available footprint, drain location, wall conditions, plumbing configuration, entry clearance, and desired fixture arrangement before construction begins. The design can incorporate porcelain or ceramic tile, waterproof wall systems, shower niches, linear or center drains, glass enclosures, and other components selected for the bathroom’s specific requirements.
The shower base and surrounding surfaces are prepared to establish proper drainage toward the drain without creating low areas where water can remain. Waterproofing membranes or approved waterproofing systems are installed across the required shower surfaces and integrated around corners, penetrations, niches, and drain connections. These layers create a controlled water-management system beneath the visible tile rather than relying on grout joints alone to prevent moisture intrusion.
Porcelain and ceramic tile are installed over the prepared waterproof assembly using an appropriate setting material and planned joint spacing. We maintain accurate slopes at the shower floor, consistent tile alignment on walls, and carefully finished transitions around niches, corners, controls, and entry areas. This installation method provides a finished walk-in shower that combines accessible entry, controlled drainage, moisture protection, and durable surface finishes.
A walk-in shower should be designed around how the user enters, moves within, and operates the space rather than treating the enclosure as a standard rectangular installation. We establish entry width, threshold configuration, showerhead location, valve height, handheld shower placement, niche position, and drain orientation according to the bathroom dimensions and planned shower layout. These details help create a practical arrangement while preserving sufficient clearance for doors, glass panels, fixtures, and bathroom circulation.
Drainage is particularly important in an open-entry shower because water must remain within the designated wet area. The shower floor is formed with a controlled slope toward the selected drain configuration, while waterproofing is integrated with the drain assembly to protect the substrate below. Linear drains can provide a streamlined appearance and allow specific floor layouts, while center drains may suit more conventional shower floor configurations.
We coordinate plumbing fixture placement with wall framing and the final tile layout so valves, showerheads, handheld systems, and other components are properly supported and positioned. Shower niches are framed and waterproofed before tile installation, with dimensions selected according to the products and storage requirements. Glass panels or doors are installed after the finished surfaces have cured and are checked for alignment, clearance, and secure attachment.
A professionally constructed walk-in shower must manage continuous moisture exposure, cleaning chemicals, temperature changes, and regular fixture use. Our installation specifications account for waterproofing continuity, tile substrate preparation, grout joint configuration, sealant placement, and appropriate transitions at shower corners and penetrations. These details reduce the risk of water reaching vulnerable structural materials behind the finished surfaces.
Porcelain tile is frequently suitable for shower walls and floors because it provides a dense, durable surface with numerous design and texture options. Smaller-format or appropriately textured floor tile can also provide more grout lines and practical slip-resistance characteristics for sloped shower floors, while larger wall tiles can reduce the number of visible joints. Grout and flexible sealant are applied according to the location and material requirements, particularly at changes of plane and movement-prone joints.
Final inspection includes checking the shower floor slope, drain performance, waterproofing details where accessible, tile alignment, grout joints, fixture operation, niche finish, glass positioning, and sealant transitions. We address visible installation deficiencies before completing the bathroom renovation. The finished shower is therefore evaluated as a complete water-management and fixture system rather than only as a decorative tile installation.
Yes, a bathtub area can often be converted into a walk-in shower when the existing footprint and plumbing configuration are suitable for the proposed design. The conversion can include a new shower base, waterproofing system, tiled walls, shower fixtures, niche, drain, and glass enclosure. Existing plumbing may require modification if the new shower controls or drain location differ from the bathtub configuration.
A complete shower assembly requires waterproofing across the areas exposed to direct and incidental water, including walls, floor surfaces, corners, penetrations, and the drain connection. The waterproofing system must be compatible with the selected substrate, tile installation method, and shower drain assembly. Waterproofing continuity is essential because grout and tile alone do not constitute a complete waterproof barrier.
Yes, a curbless shower can be constructed when the floor assembly provides sufficient depth and drainage capacity for the required shower slope. The installation may require structural or subfloor modifications to create the necessary recessed area while maintaining proper waterproofing and transition heights. Drain placement, bathroom floor elevation, waterproofing integration, and available framing depth must be evaluated before selecting a curbless configuration.
Porcelain and ceramic tile can be used when the selected product is appropriate for wet-area flooring and can accommodate the required shower slope. Smaller tiles are often useful on shower floors because their additional joints can conform more easily to sloped surfaces, while textured finishes can provide useful traction characteristics. The final selection should consider tile rating, surface texture, format, grout requirements, maintenance, and compatibility with the waterproofing system.
A standard walk-in shower installation commonly requires about 7–14 calendar days depending on demolition, plumbing changes, substrate preparation, waterproofing, tile installation, curing requirements, and glass installation. More extensive conversions can take longer when structural repairs, relocated drains, or significant plumbing modifications are required. The schedule is established after the existing bathroom conditions and selected materials are reviewed.